National Nuclear Security Administration - Service Center Internet Site

Click To Resize Text    

Pertinent Documents

Here you will find all documents that are related to this acquisition.

List of Supporting Documents

Copy of Current ProForce Contract

NSO Documents Linked Here

Documents available at DOE Directives Internet Site

The following DOE Directives (weblink) are available for review.

NAP 14 Series:

NAP 470 Series:

DOE Directives Applicable to Life Cycle Asset Management until Implementation Plan Developed

DOE DIRECTIVE AND TITLE:

NOTES:

1.    *Indicates the order contains specific requirements identified as applicable to the Device Assembly Facility (DAF), Area 6, in the Facility Specific Order Compliance Self-Assessment conducted for the Operations Readiness Review (ORR).  Upon completion of the DAF ORR, the Order will be replaced by the site-wide program as defined by the Work Smart Standards (WSSs).

2.   For DOE Orders 4300.1, Real Property Management, 4330.4 Maintenance Management        Program, 4540.1, Utility Acquisition and Management, and 6430.1, General Design Criteria, covered by DOE Order 430.1, LCAM, the Work smart Standards are considered replacements and supersede those orders.  Should these orders be referenced in orders which remain, the Work Smart Standards shall supersede the reference.

DOE Order 4330.5 Surplus Facility Transfer, and Doe Order 4700.4 Project Manager Certification are instructions to the Department of Energy, but not to the Contractor, and as such are not included in the Contract.  Forthcoming DOE guidance on project management may address these areas.

The remaining DOE Orders, covered under 430.1 LCAM (1332.1 Uniform Reporting System, 4010.1 Value Engineering, 4320.1 Site Development Planning, 4320.2 Capital Asset Management Process, 4700.1 Project Management System, 4700.3 General Plant Projects, and 5700.2 Cost Estimating), will remain applicable to the Contract work until such time as DOE notifies the Contractor, in writing, that they no longer apply.

3.  In addition, DOE Order 4330.4 and 6430.1 will remain in effect for DAF, a facility under the purview of the Defense Nuclear Facility Safety Board, until 10 CFR 830.340, (issued 1 1-16-95), are both issued as final by the Assistant Secretary for Environment, Safety and Health, DOE, and implemented by the Contractor.

 

To return to the Home Page, click on the NNSA logo.